Building Inspector
Byram Township Building Inspector
10 Mansfield Drive
Byram Township, NJ 07874
(973) 347-2500 x123
Building
Inspector /
Construction Official |
Technical
Assistant |
Zoning Official |
| Dick O'Connor |
Jill Gallo |
John Gutwerk |
| (973) 347-2500 x124 |
(973) 347-2500 x123 |
(973) 347-2500 x131 |
| |
|
|
|
Electrical |
Plumbing |
|
| Greg Chontow |
Bill O'Connor |
|
Office Hours:
Monday to Friday: 8:30AM- 4:30 PM
It is the Owner or Contractor's responsibility to request all required
inspections at least 24 hours prior to the time needed. Inspections
are to be performed within (3) business days. Please call the
Construction Office at (973) 347-2500 x123 when the work is completed so a final
inspection can be done and a Certificate issued. When calling for an
inspection, leave permit #, block, lot, name of owner, and address.
It is the owner's obligation to call this office every six (6) months maximum
to let us know the status of the work. Failure to call for inspections and
proceeding to the next phase of work is a violation of the code, and could
result in a fine of $500.00 and a termination of permit. If you
have any questions in regard to permits, call the building department and they
will let you know if a permit is required. The following are some common
types of buildings that require permits:
Roof
Requirements: Building Permit
If you are removing old shingles, ice and water shield is required before
installing new shingles. If you are putting new shingles over old ones, a
maximum of two layers are allowed. Call for inspection when job is
complete.
Pools
Requirements: Zoning, Building, Electric, and
Plumbing Permits
You must fill out zoning, building, electric and plumbing (if pool is heated)
applications. Once the applications are approved, call for inspections
when: the hold is dug (if inground pool only) and a rough electric setup (trench
dug with wires in hole, must be 18" deep) is completed. When pool is
finished, call for final inspections.
Decks
Requirements: Building and Zoning Permits
Once application is approved, call for footing inspection (before concrete is
poured). Call at the end of the job for final inspection.